Skip to main content

Posts

Showing posts with the label Consent To Establish

What is Consent to Establish and, why it required before establishing new unit?

Consent to Establish (CTE), also known as No Objection Certificate (NOC), is a mandatory legislative requirement for every industry / local body discharging any domestic sewage or tra de effluent into water body or on land and / or caus ing emission of any air pollutant in Air Pollution Control Area (APCA). A ll polluting facilities are legally required to obtain a CTE from respective State Pollution Control Board (SPCB) . The CTE will be granted after an evaluation of the potential environmental impact and design of P ollution C ontrol Measure (PCM) . The conditions for PCM is part of CTE, which should be complied.